Disaster Recovery – A Guide for Business 2026
- Cybersecurity
Cyber threats are growing faster than companies’ ability to defend against them. Ransomware attacks are increasingly well organised, and artificial intelligence is more and more often used to craft convincing phishing campaigns or to carry out infrastructure reconnaissance.
Meanwhile, on the other side, the first line of defence – people – is weakening. Over two years, the number of employees who rate their cybersecurity competences highly has fallen by 10 percentage points. According to the report “Cyber Portrait of Polish Business 2026” (“Cyberportret polskiego biznesu 2026”), this now applies to just 14% of employees. In practice, this means that a successful attack is only a matter of time, and a company’s survival depends on how quickly it can restore its systems and data.
What is disaster recovery?
Disaster recovery (DR) is a set of policies, procedures and technologies that make it possible to restore critical IT systems, applications and data after an event that has stopped them from working.
The key word is critical. Disaster recovery is not about restoring a single laptop or an accidentally deleted file. DR comes into play when a failure affects an entire environment: a server room, a data centre, a key ERP application or an entire Active Directory domain.
There is one common denominator: the event causes downtime or data loss that cannot be fixed through the IT team’s routine activities. What is needed is a previously prepared and tested scenario – in other words, a disaster recovery plan.
Key parameters: RTO, RPO and MTD
Every disaster recovery plan is based on three numbers that define how much downtime and how much lost data a company can accept. Without them, it is impossible to choose the right technology or estimate the budget.
- RPO (Recovery Point Objective) – the maximum acceptable data loss, expressed in time. An RPO of 4 h means that after a failure the company may lose at most the data from the last four hours. RPO therefore determines the data backup frequency or the replication mode.
- RTO (Recovery Time Objective) – the maximum time from the occurrence of a failure to the restoration of the service. An RTO of 2 h means that the system must be running again no later than two hours after the incident. RTO determines the architecture: whether restoring from a backup is enough, or whether a standby data centre ready for failover is required.
- MTD (Maximum Tolerable Downtime) – the maximum time after which downtime begins to threaten the existence of a business process or the entire company. This parameter comes from the Business Continuity Plan; RTO must be clearly shorter than MTD, because once a system has been restored, time is still needed to verify the data and for users to resume work.
These parameters are determined as part of a Business Impact Analysis (BIA), not “by gut feeling” in the IT department. A BIA shows the cost of an hour of downtime for a given process, the dependencies between systems, and the legal and reputational consequences of unavailability.
Disaster recovery planning: how to prepare a disaster recovery plan step by step
Disaster recovery planning is a process that results in a document (DRP) describing who does what, in what order and with which tools after a failure. A good plan helps avoid a chaotic rescue operation in which decisions made under time pressure often deepen the losses.
- Setting up the team and defining the scope. Appoint a plan owner, a DR coordinator and deputies, and determine which locations, environments and services the plan covers, including cloud and SaaS services.
- Inventory of assets and dependencies. Compile a list of applications, servers, databases, network links and privileged accounts, and map the dependencies between them.
- Risk analysis. Assess the likelihood and impact of scenarios such as ransomware, a storage array failure, the loss of a server room, a cloud provider outage or human error.
- BIA and setting RTO/RPO. Together with the business process owners, assign each system a criticality class and target recovery parameters.
- Choosing the strategy and technology. Solutions such as data backup, replication, a secondary site or DRaaS are selected to match the requirements, comparing their cost with the cost of downtime.
- Developing recovery procedures. For each scenario, prepare runbooks covering the criteria for declaring a disaster, the order in which systems are started, commands, checkpoints and the criteria for returning to the primary environment (failback).
- Communication plan. Define a notification tree, emergency channels independent of the company’s infrastructure, message templates for customers, and deadlines for notifying the CSIRT and UODO (the Polish Data Protection Authority).
- Crisis structure. The plan should describe the roles during a failure, which may differ from the day-to-day hierarchy: who declares a disaster, who approves failover, and who communicates with the management board.
- Testing and maintaining the plan. A schedule of tests and reviews is essential, as is updating the plan after every significant change to the infrastructure.
Disaster recovery team
Even the best disaster recovery plan will not work without people who know what to do in the first minute after a failure. That is why implementing the plan starts with appointing a dedicated disaster recovery team (DR team), responsible for the continuity of the IT environment and for managing data recovery processes.
Team composition and roles
A DR team is not just administrators. It includes key technical staff, but also people responsible for business decisions and communication.
| Role | Main tasks during a failure | Tasks outside a crisis |
|---|---|---|
| DR coordinator (leader) | Declaring a disaster, deciding on failover, overseeing the entire data recovery process | Plan owner, test schedule, reporting to the management board |
| Infrastructure team | Starting systems at the secondary site: network, virtualisation, storage, identity | Maintaining replication and the standby environment |
| Backup and data team | Selecting the recovery point, restoring backups, verifying database consistency | Monitoring data backup jobs, backup and recovery testing |
| Application team | Starting and configuring business applications, functional testing | Updating runbooks after changes to applications |
| Security (SOC/CSIRT) | Incident containment, threat analysis, notifications to the CSIRT and UODO | Protecting the backup system, risk analysis |
| Communication | Informing employees, customers and other stakeholders | Preparing message templates and the notification tree |
| Business representatives | Confirming that restored services work correctly; recovery priorities | Participating in the BIA and setting RTO/RPO |
Every role must have a designated deputy. A failure can happen at night, during holidays or when a key person is unreachable.
Testing and maintaining the disaster recovery plan
An untested disaster recovery plan is a hypothesis, not a safeguard. Only testing reveals missing dependencies, outdated passwords or gaps in procedures before a real failure does.
A testing programme should cover several levels: regular documentation reviews, tabletop exercises in which the team walks through a failure scenario step by step, periodic backup and recovery tests in an isolated environment and, at least once a year, a failover test of the entire environment at the secondary site.
Each test should end with a report on the RTO and RPO achieved and a list of corrective actions, and the plan itself should be updated after every significant change to the infrastructure or the team.
The most common mistakes in disaster recovery planning
- Equating backup with DR – the company has copies, but no infrastructure on which to run them and no idea how long it would take.
- RTO and RPO set by IT without business involvement – the parameters do not reflect the real cost of downtime, so protection is either oversized or insufficient.
- No testing – the plan is created for an audit and ends up in a drawer; the first attempt to execute it takes place during a real failure.
- Backups accessible to attackers – backup repositories in the same AD domain as production, without immutability and without MFA.
- Overlooking dependencies – the restored application does not work because DNS, certificates, licences or service accounts were forgotten.
- Ignoring SaaS and the cloud – assuming that Microsoft 365 or cloud systems “protect themselves”.
- Plan available only within the protected infrastructure – no offline version or copy in an independent system.
- Outdated documentation – contact details for people who have left the company, and procedures for systems that no longer exist.
Backup vs disaster recovery – the foundation, but not the whole picture
Data backup is a prerequisite for disaster recovery, but it is not disaster recovery in itself. A backup answers the question “do we have the data?”, while disaster recovery answers the question “will we restore working services, and how quickly?”.
The term backup and disaster recovery (often abbreviated as BDR) describes solutions that combine both worlds: backups that can not only be restored but also run directly as virtual machines at a secondary site or in the cloud (instant recovery).
The 3-2-1-1-0 rule
The modern standard for backup resilience is the 3-2-1-1-0 rule:
- 3 copies of data (production + two backups),
- on 2 different types of media or systems,
- 1 copy outside the main location (offsite, e.g. in the cloud),
- 1 copy that is offline, isolated (air gap) or immutable,
- 0 errors when verifying recoverability.
Disaster recovery in the cloud and Disaster Recovery as a Service (DRaaS)
Disaster recovery in the cloud makes it possible to build a secondary site without investing in a second data centre. Instead of maintaining idle hardware, the company pays for storing replicas and backups, and launches full computing power only at the moment of a failure or a test. Before choosing a solution, however, check the terms, such as the region, the real cost and compliance with regulatory requirements.
Deployment models
- Cloud backup with on-premises recovery – the cloud serves as an offsite copy. Inexpensive, but RTO depends on link bandwidth when downloading the data.
- On-premises → cloud (hybrid DR) – virtual machines are replicated to a public or private cloud and started there after a failure. The most popular model among medium-sized companies.
- Cloud → cloud – protecting workloads that already run in the cloud by replicating them to another region or another provider. Protects against regional outages and configuration errors.
- DRaaS (Disaster Recovery as a Service) – a managed service in which the provider is responsible for the standby infrastructure, replication and often also for runbooks and carrying out tests. The company receives RTO and RPO defined in the contract.
Data recovery after a failure – how it works in practice
Data recovery after a failure takes place in several stages, and each of them should be described in runbooks before an incident, not during it.
- Detection and assessment – monitoring or users report the problem; the team determines the scale and the cause, and whether the criteria for declaring a disaster have been met.
- Plan activation – an authorised person announces the activation of the DRP, the crisis team convenes on the emergency communication channel, and the notification tree is triggered.
- Containment (in the event of a cyberattack) – isolating infected segments, preserving evidence for forensic analysis, reporting the incident to the competent CSIRT and – in the event of a personal data breach – to UODO within 72 hours.
- Selecting the recovery point – with ransomware, it is crucial to identify the last “clean” copy; data should be scanned before restoration so as not to restore the malware.
- Failover and recovery – starting systems in a defined order: first the network, identity (AD/Entra ID) and DNS, then databases, applications and user-facing services.
- Verification – data consistency tests, transaction integrity checks, and confirmation by the business owners that the service is working correctly.
- Return (failback) – once the cause has been removed and the primary environment rebuilt, data is synchronised back and traffic is switched over in a planned window.
- Post-incident review – root cause analysis, comparison of the actual RTO/RPO with the assumptions, and updating the plan.
The most common source of delays is not technology but a lack of decisions: who has the authority to declare a disaster and approve failover. These powers should be clearly set out in the plan, together with deputies.
Summary and next step
Effective disaster recovery starts with business decisions, not with choosing a tool. However, it is only part of a bigger picture. For a company to survive a crisis, the IT recovery plan must be tied to the business continuity plan of the entire organisation: its processes, people, suppliers and communication.